Pages

Friday, October 30, 2015

Bridge to #5 fairway is now open!

Gary Farrer and Gabriel Tavera Alvarez inspect their bridge repair work. Special ordered 4x6x16 foot long pressure treated lumber was used for the repair. The easy access route to the teaching tee is now open for business.

1 comment:

  1. I love your blog. I’ve added it to my favorite bookmarks and subscribed in a reader. Looking forward to reading more posts.

    _________________________
    American Actor HD Wallpapers

    ReplyDelete