Tuesday, October 29, 2013

This is the old left greenside bunker at #4.
This is the new shape of the bunker, it is longer and narrower than the original.
New bunker with drainage and fabric installed. The fabric is used to help keep the sub-soil from mixing with the sand over time.

Monday, October 28, 2013

Tuesday, October 22, 2013

Monday, October 21, 2013

I have seen it all now!

Sunday, October 20, 2013

Stump removal in process.

This bottom picture is what the area looks like after the stump grinding process. Next will be grindings clean up followed by filling the hole with soil, and the final piece is sod installation.

Saturday, October 19, 2013

Dave Liotta captures"Belcher Tree Fund Shootout".

After almost sinking a 20 foot birdie putt on the 18th hole to avoid a chip off, Dave chipped in from the elevated area behind the green to win this years shootout. Bob Haas almost chipped in also, but his shot went a little right of the hole.

Atcavage,Haas and Liotta advance to the final hole of the "shootout".

Final three left in the tree fund shoot out .

Thursday, October 17, 2013

No, this is not a halloween decoration!

 This is one of a few tree stumps we have on the golf course getting ready to be stump ground. I paint the stump for identification and an an outline for the machine to grind out to.

Monday, October 14, 2013

Testing products at the practice facility for extended fall color.

Add caption
Parts of the practice tee and approach have been sprayed with a product to extend green color into the cooler fall months. This is one of two products we will be using in order to extend the season at the practice facility.

Tuesday, October 1, 2013

Practice green is ready to accept play.

Ten weeks after seeding the practice green is open for play. It is presently mature enough to handle all the different ball marks that will come it's way. The cutting height right now is .170" and that height will be lowered to regular greens height by the end of the year. Enjoy!