Sub -surface greens drainage is being installed on the 6th green today.
Staff from Golf Preservations trenching drainage channel on the 6th green in preparation for installing 2" drain pipe. The 6th green should be complete on Thursday. The 17th green will be the next and last green for drainage installation this year.
No comments:
Post a Comment