View from 14 tee towards 16 green after tree removal.
Thursday, September 29, 2011
Low hole construction started.
Please be aware that during the construction of the dry creek and low holes, spectators will not be permitted in those areas. This is a safety concern of both WVCC and McDonald and Sons.Please do not put the golf shop employees in an uncomfortable position by asking them for a cart "to see what's going on".
Tuesday, September 27, 2011
Reminder! Flood plain project has started and the 9 holes that are open has changed. Holes #'s 11,12 and 17 are not available to play and will be replaced with 4, 5 and a par three to the practice green.
Monday, September 26, 2011
Silt fencing being installed in preparation for project.
Sunday, September 25, 2011
Sunday Sept.25th.....High nine open with carts.
Saturday, September 24, 2011
Saturday Sept 24th.. High nine open -Walkers only- Range open on Mats
Friday, September 23, 2011
Equipment being staged to start "The flood plain project".
Wednesday, September 21, 2011
John Fleming installing a 4" gate valve in preparation for next weeks construction project.
Friday, September 16, 2011
Removal of fallen trees in the Wissahickon creek on hole #1.
Wednesday, September 14, 2011
"We are not alone on this one" Slideshow: Weathering The Storm: Golfdigest.com
Tuesday, September 13, 2011
This is the bench to #5 tee. It was found in the Wissahickon Creek at Bells Mill Rd
Monday, September 12, 2011
I can't believe it rained another inch last night!
Sunday, September 11, 2011
Bench from the 18th tee
Thursday, September 8, 2011
5th Green area
Flash Flood Thurs September 8th, 2011 am
http://www.youtube.com/watch?v=QOWDA4HOBJM
Tony Gustaitis
Wednesday, September 7, 2011
View of #15 and 13 greens at 2:00pm Wednesday.
Over 4" of rain since yesterday. This brings the total rainfall since August 1st to OVER 25" of RAINFALL.
Tuesday, September 6, 2011
Bunker clean up process after Irene.
http://www.youtube.com/watch?v=J-VIDkiaL0M
Tony Gustaitis
Subscribe to:
Posts
(Atom)
Blog Archive
-
▼
2011
(150)
-
▼
September
(18)
- View from 14 tee towards 16 green after tree remov...
- Low hole construction started.
- Reminder! Flood plain project has started and the...
- Silt fencing being installed in preparation for pr...
- Sunday Sept.25th.....High nine open with carts.
- Saturday Sept 24th.. High nine open -Walkers only-...
- Equipment being staged to start "The flood plain p...
- John Fleming installing a 4" gate valve in prepara...
- Removal of fallen trees in the Wissahickon creek o...
- "We are not alone on this one" Slideshow: Weatheri...
- This is the bench to #5 tee. It was found in the W...
- I can't believe it rained another inch last night!...
- Bench from the 18th tee
- 5th Green area
- Flash Flood Thurs September 8th, 2011 am
- View of #15 and 13 greens at 2:00pm Wednesday.
- Over 4" of rain since yesterday. This brings the t...
- Bunker clean up process after Irene.
-
▼
September
(18)