Sunday, September 25, 2011
Sunday Sept.25th.....High nine open with carts.
Subscribe to:
Post Comments
(Atom)
Blog Archive
-
▼
2011
(150)
-
▼
September
(18)
- View from 14 tee towards 16 green after tree remov...
- Low hole construction started.
- Reminder! Flood plain project has started and the...
- Silt fencing being installed in preparation for pr...
- Sunday Sept.25th.....High nine open with carts.
- Saturday Sept 24th.. High nine open -Walkers only-...
- Equipment being staged to start "The flood plain p...
- John Fleming installing a 4" gate valve in prepara...
- Removal of fallen trees in the Wissahickon creek o...
- "We are not alone on this one" Slideshow: Weatheri...
- This is the bench to #5 tee. It was found in the W...
- I can't believe it rained another inch last night!...
- Bench from the 18th tee
- 5th Green area
- Flash Flood Thurs September 8th, 2011 am
- View of #15 and 13 greens at 2:00pm Wednesday.
- Over 4" of rain since yesterday. This brings the t...
- Bunker clean up process after Irene.
-
▼
September
(18)
0 comments:
Post a Comment