Monday, November 7, 2011
35 Whitemarsh members came out for Sunday's construction tour.
Subscribe to:
Post Comments
(Atom)
Blog Archive
-
▼
2011
(150)
-
▼
November
(21)
- View from the back of the 13th green looking at th...
- Sub-surface drainage being installed on the 18th g...
- Bank of 14 fairway pond after sod installation.
- HAPPY THANKSGIVING ! Golf course open with carts o...
- Bridge abutment complete on the tee side of #2.
- GOOD NEWS! The 1st hole is open again :)
- Irrigation being installed on #14 fairway.
- New "dry creek" being tested today.
- #13 fairway at 3:00 pm
- The start of #13 fairway being sodded. 8:30 am
- Topsoil being placed and graded on #14 fairway.
- Fill soil being shaped on #14 fairway.
- Dozer pushing topsoil on to 15 fairway near the gr...
- 35 Whitemarsh members came out for Sunday's constr...
- Irrigation pipe being installed under the "dry cre...
- Drain pipe under path at the 16th tee complete
- Concrete truck feeding the pump truck to pour brid...
- View from 17 fairway towards the green. Notice the...
-
▼
November
(21)

0 comments:
Post a Comment