Sunday, October 30, 2011
Need I say anything!
Friday, October 28, 2011
Old Pipe(6") from the flood plain project being returned to grounds maintenance facility to be re-used. John Fleming and Santos in the lead cart.
Thursday, October 27, 2011
Rock wall in front of #17 green being put into place.
Workers finishing the sod work at #1 fairway.
Wednesday, October 26, 2011
Final area of dredging at #14 fairway pond. Notice the depth of sediment.
Monday, October 24, 2011
This trench line is the rock wall area for #17 approach.
Saturday, October 22, 2011
Stone wall at #17 ready to be placed.
Friday, October 21, 2011
Conditions update:
Golf Course Update as of Oct 21, 2011:
Weather conditions have improved greatly over the last few weeks. When it does rain, it is now followed by four days of sunny, dry weather. If you remember the last two and a half months we would have a rainy day followed by four more rainy days. The next five days look promising for both the turf and golf.
Improvements are continuing on holes 1 and 18 to repair damage from the wet weather. We have continued to sod more areas on the right side of 1 fairway. The main benefit of this process is to reclaim proper drain channels and to improve the turf. Stripping of the turf has been completed on the 1st fairway. Low pockets have been graded out so they do not hold excess water. The remainder of the bentgrass sod on the 1st fairway will be installed the week of Oct. 31. As was mentioned before, the existing turf on the fairway was extremely thin from the constant flooding and silt layering. Also, the rough surrounding the 18th fairway will be replaced with bluegrass sod out to 33 feet from the fairway edge. Grading work has also been done to hasten drainage off the fairway.
Flood Plain Project:
Work Completed since Oct 7th:
Three of the four ponds are finished with the dredging process.
Two of the six bridge abutments have been excavated and one is in process of forming out the footers.
Phase 1 of the dry creek is completed.
A portion of fill has been placed on fairways 13,14 and 15.
Wall layout for #17 has been staked out.
The fourth pond is in the dredging process.
For daily progress updates log on to www.wvccgreens.blogspot.com
Weather conditions have improved greatly over the last few weeks. When it does rain, it is now followed by four days of sunny, dry weather. If you remember the last two and a half months we would have a rainy day followed by four more rainy days. The next five days look promising for both the turf and golf.
Improvements are continuing on holes 1 and 18 to repair damage from the wet weather. We have continued to sod more areas on the right side of 1 fairway. The main benefit of this process is to reclaim proper drain channels and to improve the turf. Stripping of the turf has been completed on the 1st fairway. Low pockets have been graded out so they do not hold excess water. The remainder of the bentgrass sod on the 1st fairway will be installed the week of Oct. 31. As was mentioned before, the existing turf on the fairway was extremely thin from the constant flooding and silt layering. Also, the rough surrounding the 18th fairway will be replaced with bluegrass sod out to 33 feet from the fairway edge. Grading work has also been done to hasten drainage off the fairway.
Flood Plain Project:
Work Completed since Oct 7th:
Three of the four ponds are finished with the dredging process.
Two of the six bridge abutments have been excavated and one is in process of forming out the footers.
Phase 1 of the dry creek is completed.
A portion of fill has been placed on fairways 13,14 and 15.
Wall layout for #17 has been staked out.
The fourth pond is in the dredging process.
For daily progress updates log on to www.wvccgreens.blogspot.com
Forming of footer for new bridge.
Wednesday, October 19, 2011
Aerial view of construction on holes 13,14 and 15.
Tuesday, October 18, 2011
Initial phase of dry creek being prepared for sod installation.
Friday, October 14, 2011
Due to the rain last night 1/2 ", low hole construction has been delayed.
Thursday, October 13, 2011
Pond in front of 14 men's tee after dredging.
GAP Super Senior 2011 Golf Champion - Jack Rowe - holding his recently awarded Trophy.
Wednesday, October 12, 2011
4 of the 5 bridges have been removed, now the widening of the dry creek begins.
Tuesday, October 11, 2011
Dredging complete of the pond at the tee end of 13.
Different view of dredging of pond at the 13th green.
Sunday, October 9, 2011
Pond at 13 (in front of green) being dredged. See if you can spot the old flagstick and flag.
Saturday, October 8, 2011
The 1st fairway being sooded with Bentgrass.
Thursday, October 6, 2011
View from 13 tee, removing topsoil from fairway and pond being dredged.
Wednesday, October 5, 2011
Demo of bridge in front of 11 tee.
Monday, October 3, 2011
Topsoil from #14 fairway being stockpiled.
Subscribe to:
Posts
(Atom)
Blog Archive
-
▼
2011
(150)
-
▼
October
(22)
- Need I say anything!
- Old Pipe(6") from the flood plain project being re...
- Rock wall in front of #17 green being put into pla...
- Workers finishing the sod work at #1 fairway.
- Final area of dredging at #14 fairway pond. Notice...
- This trench line is the rock wall area for #17 app...
- Stone wall at #17 ready to be placed.
- Conditions update:
- Forming of footer for new bridge.
- Aerial view of construction on holes 13,14 and 15....
- Initial phase of dry creek being prepared for sod ...
- Due to the rain last night 1/2 ", low hole constru...
- Pond in front of 14 men's tee after dredging.
- GAP Super Senior 2011 Golf Champion - Jack Rowe - ...
- 4 of the 5 bridges have been removed, now the wide...
- Dredging complete of the pond at the tee end of 13...
- Different view of dredging of pond at the 13th gre...
- Pond at 13 (in front of green) being dredged. See ...
- The 1st fairway being sooded with Bentgrass.
- View from 13 tee, removing topsoil from fairway an...
- Demo of bridge in front of 11 tee.
- Topsoil from #14 fairway being stockpiled.
-
▼
October
(22)