Bunker construction left of the 18th green.

This picture shows the roughed out shape of the bunker with the edge lines painted in orange and flagged (the flags were place due to a forecasted rain event coming which would wash away the paint).
This is the end result in this area. You would assume that this result would be achieved in a short period of time after the bunkers are roughed out. The pic at the top of the page is only the first 20% of the total work involved. The bunker would still need to be edged, dug to final depth, drainage installed and fabric liner placed. And we must not forget.........sand!






























 